There was a little challenge getting the truck into the site. It kept getting stuck in the mud.
Gravel was brought in earlier in the week and the foundation was laid out.
The crane used to lift the panels into place.
First corner in place. This is the back corner of the house where the den will be. Above the line where the tabs are is where the brick will go.
The back of the house.
On the right (east) side of the house looking into the garage. Bottom photo is of the turret under the master bedroom sitting area.












No comments:
Post a Comment