Sunday, February 3, 2013

Cabinets are in!

The walls are painted and the cabinets are in! The tile guys are working on the master bath and the generator and HVAC units are installed. There is still alot to do but it’s moving along. I’m thinking first week of March but Rob is still saying end of Feb. We’ll see. As long as we modify by March 15th we’re good.

Above, the generator, and the downstairs and upstairs hvac units.

 The sitting area of the master bedroom.

 The dining room - LOVE the color!
 Kitchen. Granite to be installed soon. One cabinet has yet to be installed next to the pantry.


 Above and below is the laundry room. We hinged the counter so we can get to the litter box that will go under the cabinet.

 Above, the powder room next to the laundry room.
 Art room cabinet above, and upstairs bathroom cabinet below.

Above,  the drop zone between the laundry and door to the garage.
 The master bath tile, just waiting to be grouted. The tile guys had a space heater going so it was nice and cozy in there. They still had some more work to do so we got out of their way.